Aerospace drawings ask a lot of even the smallest machine screws. This post goes through what engineers look at when they specify one and what buyers usually ask a supplier for before an order goes out.
Key Takeaways
Fasteners take up more of an aircraft drawing pack than most people would guess. The quality team will go through each page of it at some stage, usually more than once. When a fitter opens a box of machine screws on the line, those screws were made to match the size and finish written on that page.
Procurement staff who buy machine screws for aerospace programmes would like each delivery to look the same as the last, and most say so early on. A screw made to the right specification goes in by hand on the line and then stays put for years. The sections below go through what is involved in getting there.
Checking the Thread Size and Class: A fitter will look at the size and pitch first, mostly out of habit. Aerospace drawings add a thread class on top of that, and it decides whether the screw turns into its nut with a bit of play or quite snugly. Someone in the stores will probably have a gauge for it.
Noting the Alloy beside Each Part Number: Screws used near the engines are usually made from heat-resistant alloys, and the shop has to be set up to machine them. The grade is written on the drawing, and the certificate for it is kept with the batch. Auditors come round once or twice a year, and they usually ask for it.
Picking a Head That Sits Flush: On outer skins and access panels most designers go for a countersunk head, mainly because it sits level with the surface. The drive recess gets some thought. A fitter might be reaching under a floor panel at an awkward angle, and a recess that holds the bit properly makes that easier.
Deciding How Much Thread Takes the Load: Engagement is the length of thread doing the holding. Thin aluminium sheet has barely any to offer, and a nut plate behind the panel is the usual answer. People quote one and a half to two diameters in aluminium, though the drawing has the final say. Other checks come up too.
Measuring a Sample from Each Lot: A handful of screws come out of every lot for checking before anything gets packed. Go and no-go gauges are run over the threads by hand, which is slow, but nobody minds much. Some head features might need a microscope. The hardness results go onto a sheet that is packed in with the order.
Following the Lot Number Back: The lot number on the label ties those screws to one bar of material and one mill certificate. Procurement teams like having that on file. If a query comes up about a screw fitted three years ago, the lot number is usually enough to pull up every record the quality office needs.
Making Screws to a Defined Specification: Aerospace buyers rarely pick a screw straight off a shelf. Their order points to a standard or a customer drawing, and the job is set up around that. Shops that keep their machine screws close to specification lot after lot usually see the same buyers return for the next programme.
Talking Requirements Through Early: A short call before the purchase order goes out can clear up most questions about plating or thread class. Some buyers send the drawing over first and ask for comments, which manufacturers are happy to give. It also shows the buyer whether the shop’s people read the small notes at the bottom of the page.
Engineers starting on a new assembly can send their drawings across and ask for a quote on machine screws made to that exact specification. Most of the early questions get sorted on the first call, usually about plating or thread class, and anything left over can be picked up once the first sample parts arrive for checking.